Prototype · compare · improve

Testing-Led Design Optimisation

Testing-led product-development support for windows, doors, hardware and related building products.

What the test tells you

Fail earlier.
Learn cheaper.

SIIGMATIC was created from exactly this need: an engineering team wanted testing to inform the next design iteration, not simply provide a result at the end. That development mindset remains a useful service alongside formal certification.

Design-optimisation work may use custom or development methods. The report will make clear what is accredited, what is measured development data and what is engineering interpretation.

Typical scope

What we can
put under test.

01

Baseline test

Measure the current product before changing it.

02

Failure localisation

Use evidence to identify where deformation, leakage, wear or load concentration begins.

03

Variant comparison

Change one or more design variables and repeat the same method.

04

Prototype validation

Confirm that the proposed change addresses the original problem.

05

Pre-certification screening

Resolve obvious issues before the final formal test campaign.

Not sure about specimen, method or scope?

Talk before you ship it.

Ask the laboratory →