SIIGMATIC practical guides

AS 2047 Testing Explained: A Manufacturer’s Guide

Understand AS 2047 window and door testing: the five performance questions, preparation, report scope and how testing differs from WERS.

AS 2047 testing establishes physical performance. It addresses window and external glazed-door behaviour under operating, air, water and structural tests. Energy ratings answer a different question. Use this guide to prepare a useful conversation with a laboratory, not as a substitute for the standard or a project specification.

What does AS 2047 testing assess?

For a manufacturer, a useful starting point is the product family and the performance it needs to demonstrate. AS 2047 is the Australian standard for windows and external glazed doors in buildings. Relevant AS 4420 test methods establish how the nominated specimen behaves. The test programme and applicable requirements must be agreed for the product and intended use.

  • Deflection: how the frame and sash move under nominated wind pressure.
  • Operating force: the effort needed to operate the window or door through the relevant test sequence.
  • Air infiltration: air leakage through the closed specimen under the test conditions.
  • Water penetration resistance: the assembly’s resistance to water entry under the nominated pressure and water exposure.
  • Ultimate strength: structural response under the nominated ultimate loading.

These results serve different purposes. Low operating effort does not prove water resistance; a strong frame does not establish low air leakage. The report needs to be read as evidence for the documented system and test conditions.

How do you prepare a window or door for testing?

Start with the information already available rather than manufacturing a specimen around an assumed test. Send the laboratory the opening type, product drawings, proposed dimensions and intended market. Include nominated performance requirements where known, and explain whether you are investigating a prototype or seeking final performance evidence.

The laboratory can then discuss the appropriate specimen and test scope. Frame and sash construction, glass, seals, drainage, hardware and fixing arrangements can all matter. Agree the preparation and delivery arrangements before shipping the specimen. Do not substitute a generic online checklist for the laboratory’s job-specific instructions.

Does every size need its own test?

Do not assume either that every manufactured size requires a separate physical test or that one result covers an entire catalogue. Product-family coverage, specimen selection and permitted variations depend on the applicable rules and supporting evidence. Ask how the proposed test relates to the range you intend to sell.

What does an AS 2047 test report establish?

A useful report identifies the specimen, configuration, methods, conditions and measured performance. Read those details alongside the proposed product. A different seal, hardware arrangement, drainage detail or frame dimension may require further review rather than an assumption that the original result still applies.

NATA accredits laboratory activities within a published scope. A laboratory’s accreditation is not blanket certification of every product or service it offers. Check that the requested work is within scope and understand the report’s limitations. Product selection, installation and project compliance remain separate decisions that must use the appropriate evidence.

Can testing help during development?

Yes. An agreed development programme can help locate leakage, excessive movement or operating problems and compare design variants. Keep the baseline and test setup consistent enough to learn from a change. Development results should be distinguished from a final accredited test programme; a promising prototype result is not an automatic approval for production variations.

What affects testing cost and turnaround?

The product, specimen arrangement, required performance, test programme, rig preparation and any repeat work affect the scope. A useful quotation starts with those details. Confirm current laboratory availability and reporting arrangements directly rather than relying on a generic price or delivery promise. If timing is important, explain the intended launch or project deadline in the enquiry.

AS 2047 testing and WERS ratings: do you need both?

Physical performance and energy performance are complementary. AS 2047 testing does not by itself provide a whole-window U-value or SHGC rating. WERS rates the energy performance of the complete window or glazed door through the applicable scheme process. Air-infiltration evidence may be relevant to that pathway, but a WERS rating is not a replacement for the physical-performance evidence required for the product.

Read the WERS ratings guide, or compare WERS and standalone performance reports before choosing a deliverable.

Discuss your window or door system

SIIGMATIC’s Hallam, Melbourne laboratory supports window and door manufacturers with testing and development investigations. See the AS 2047 testing service for scope and laboratory information, or request a scoped testing proposal.

Further reference

Check SIIGMATIC’s published NATA scope and AGWA technical resources. Confirm the applicable standard, edition and project requirements with the responsible professionals. This guide summarises the questions to resolve; it does not reproduce the standard or prescribe a test plan.